|
DEPENDABLE Moisture Barrier
Chart | |||
|
Coverage |
Vaporseal
SB |
Vaporseal
DB |
Cutdown II |
|
New (7-day) concrete
slabs |
ü |
ü |
NO |
|
Wood |
NO |
NO |
ü |
|
Cutback or other adhesive
residues |
NO |
NO |
ü |
|
Oil
contamination |
ü |
NO |
NO |
|
FEATURES |
Vaporseal
SB |
Vaporseal
DB |
Cutdown II |
|
Base
Material |
Epoxy |
Epoxy |
Latex |
|
Max. Previous emission
rate (ASTM # F1869) |
25 lbs. |
25 lbs. |
15 lbs. |
|
Surface Preparation
Required: |
|
|
|
|
Surface
Contaminants |
Remove All |
Remove All |
Some Allowed |
|
Profile
Required |
CSP-2 or 3 |
CSP-2 or 3 |
No (1) |
|
Surface
Required |
Open, Absorptive |
Open, Absorptive |
Bondable |
|
Surface Application
Condition Required |
Dampen |
Dampen |
Dry to Slightly Damp |
|
Adhesive
Compatibility |
Limited |
Good |
Excellent |
|
Coats
Required |
1 |
1 |
2 or 3 |
|
Coverage Rate - Per
Unit |
160-240 |
168-264 |
360-600 |
|
(sq. ft. per
gallon) |
(75-115) |
(70-110) |
(160-350) |
|
Work Time (70º-
73ºF) |
60 minutes |
DB-5: 15 minutes DB-12: 30
minutes |
20-30 Minutes |
|
Re-Coat Time (70º-
73ºF) |
12 Hours |
DB-5: 4-5 Hours DB-12: 12
Hours |
2-3 Hours |
|
Cover
Time |
12 Hours |
DB-5: 4-5 Hours (within 5 days) |
24 Hours or more |
|
Warranty |
10-Year Full Floor |
10 Year Full Floor |
Prorated 5 Year |
|
LEED
Features |
|
|
|
|
VOC Content
(g/l) |
55 |
0 |
0 |
|
(1) Floor covering that
creates tension on the surface, like glued down wood; require the best
bond for the Cutdown CSP (Profile) of 2-3 is
required. | |||